Sewage Treatment Plant Installation & Maintenance Kenya | Maji Hill – Design, Install, Operate
NEMA-Compliant · Kenya-Wide

Sewage Treatment
Plant Installation
& Maintenance Kenya

Full-lifecycle sewage treatment plant services across Kenya — site surveys, STP design, civil and mechanical construction, commissioning, operator training, and ongoing O&M contracts. NEMA-compliant solutions for residential estates, gated communities, hotels, hospitals, schools, and commercial developments. Treat it right. Stay compliant. Protect your investment.

Full-Lifecycle
Design Through O&M
NEMA
Compliant Standards
4.9★
Client Satisfaction
Kenya-Wide
STP Project Delivery
NEMA Licence Support Design, Build & Operate Residential, Commercial & Industrial Quarterly Compliance Testing 24/7 Maintenance Response
Why It Matters

WHY KENYAN DEVELOPMENTS NEED A SEWAGE TREATMENT PLANT

Rapid urbanisation, peri-urban expansion, and Kenya’s housing boom are placing millions of people outside the reach of municipal sewer networks. NEMA enforcement of the Water Quality Regulations 2006 is intensifying. The cost of a shutdown or fine is far higher than a properly designed STP.

⚖️

Legal Requirement in Kenya

Kenya’s Environmental Management and Coordination (Water Quality) Regulations 2006 make it a criminal offence to discharge untreated sewage to any water body, drain, or ground. All developments outside the municipal sewer network must install and operate a licensed sewage treatment plant.

🏠

Enables Development Approval

County governments and NEMA will not grant development approval or occupation certificates for large residential, commercial, or institutional developments without a satisfactory sewage management plan and EIA licence. A properly designed STP is required from the planning stage.

🌊

Protects Groundwater and Rivers

Untreated sewage from septic tanks, soakage pits, and open defecation contaminates rivers, shallow wells, and boreholes — sources communities rely on for drinking water. A functioning STP is the responsible alternative that protects downstream communities and Kenya’s water heritage.

♻️

Treated Water Can Be Reused

A well-designed STP produces treated effluent of quality suitable for irrigation of gardens, landscaping, sports fields, and even toilet flushing — reducing mains water consumption significantly. On estates and resorts, water reuse can cut water costs by 30–50%.

💰

Cheaper Than Septic Failure

Septic tanks and soakage pits require emptying, eventually fail, contaminate soil, and create public health and regulatory liability. A properly sized STP costs less over 15 years than repeated septic desludging and groundwater remediation — and keeps you NEMA compliant.

🏅

Property Value and Marketability

Gated estates and commercial developments with certified sewage treatment systems command better market positioning. Buyers, investors, and tenants increasingly ask for environmental compliance documentation — and a licensed STP with O&M records is a tangible differentiator.

Full-Lifecycle Services

SEWAGE TREATMENT PLANT SERVICES BY PROJECT PHASE

Select the phase that matches your current situation. Maji Hill delivers across the complete STP lifecycle — from initial site survey to long-term operations, maintenance, and NEMA compliance management.

STP Design Services

  • Site survey and population / flow assessment
  • Sewage characterisation and load calculation
  • Technology selection and feasibility study report
  • Concept and preliminary process design
  • Detailed civil, mechanical, and electrical design
  • Equipment specifications and procurement plan
  • EIA study preparation and NEMA submission
  • Cost estimation and phased construction schedule

Design Deliverables

  • Population and flow assessment report
  • Technology selection and justification report
  • Process flow diagrams and P&IDs
  • Civil and structural engineering drawings
  • Mechanical and electrical drawings
  • Equipment specification sheets
  • Bill of quantities and cost plan
  • EIA documentation for NEMA submission

STP Installation Services

  • Civil works — tanks, chambers, and structures
  • Package STP supply and installation
  • Mechanical installation — pumps, blowers, media
  • Electrical and instrumentation installation
  • Sludge handling and drying bed construction
  • Inlet works, screening, and grit removal
  • Disinfection system installation (UV / chlorination)
  • Commissioning, seeding, and performance testing

Installation Standards & Guarantees

  • NCA-registered contractor and site engineers
  • Construction per NEMA-compliant design drawings
  • Performance test to discharge consent standards
  • As-built drawings and O&M manuals issued
  • 12-month defects liability period (DLP)
  • Structured operator training on handover
  • Spare parts schedule and procurement list
  • Commissioning report and handover certificate

Maintenance Contract Services

  • Daily plant checks by trained STP operators
  • Routine preventative maintenance schedule
  • Chemical dosing procurement and management
  • Sludge desludging, dewatering, and legal disposal
  • Quarterly effluent quality testing (KEBS lab)
  • Monthly plant performance report
  • Emergency breakdown response and repair
  • Pump, blower, and equipment servicing

Why an O&M Contract Makes Sense

  • Guaranteed NEMA compliance maintained
  • Fixed monthly cost — no budget surprises
  • No need for in-house STP technical expertise
  • Annual NEMA audit report prepared and submitted
  • 24/7 emergency response commitment
  • Continuous process optimisation by specialists
  • Equipment lifecycle management included
  • Monthly, quarterly, or annual contract terms

NEMA Compliance Services

  • EIA project report preparation and NEMA submission
  • Discharge consent application and negotiation
  • Quarterly effluent monitoring (KEBS-accredited lab)
  • Annual environmental audit report preparation
  • NEMA inspection preparation and attendance
  • Non-compliance corrective action planning
  • Effluent quality improvement programme
  • WRMA discharge and abstraction licence support

Compliance Documentation Delivered

  • EIA licence and NEMA project approval
  • Discharge consent certificate
  • Quarterly effluent quality test certificates
  • Annual environmental audit report
  • Plant operations and maintenance log
  • Incident and corrective action register
  • NEMA correspondence management
  • Regulatory defence documentation on request
STP Technologies

SEWAGE TREATMENT TECHNOLOGIES WE INSTALL IN KENYA

The right STP technology for your development depends on the number of users, site area, discharge point, operational complexity tolerance, and capital budget. We select the optimal technology — not the most convenient one.

Package Sewage Treatment Plants (Biodigester / Packaged Unit)

Factory-built, pre-engineered package STPs are the most popular choice for developments in Kenya requiring fast, NEMA-compliant sewage treatment with minimal civil works. Units are available in fibreglass, HDPE, or steel and process flows from 1 m³/day (single household) to 500 m³/day (large estate). Biological treatment within a compact pre-made tank makes them ideal for space-constrained sites, remote plots, and projects where construction time is critical.

Fast Installation Minimal Civil Works 1 – 500 m³/day Remote Locations Residential Estates 6–8 Weeks to Compliance
Most Popular
Fastest Install

Activated Sludge Plant (ASP)

The global standard for large-scale sewage treatment. A combination of aeration tanks — where micro-organisms break down organic matter — and secondary clarifiers that separate clean water from sludge. ASP can be configured for nitrification, denitrification, and phosphorus removal, producing high-quality treated effluent. It is the preferred technology for large residential estates, hospitals, universities, and institutions generating more than 100 m³/day of sewage.

High-Volume Flows Excellent BOD Removal Nutrient Removal Option Hospitals Universities Large Estates
High Volume
Proven Technology

Moving Bed Biofilm Reactor (MBBR)

MBBR grows micro-organisms on plastic carrier media suspended in the reactor, producing excellent treatment in a footprint up to 50% smaller than equivalent ASP systems. No sludge return system required, simpler to operate, and highly resilient to population load variations — ideal for hotels and resorts, schools, and gated estates where operational staffing is limited and flows fluctuate seasonally or daily.

Compact Footprint Hotels & Resorts Schools Gated Estates Simple Operation Load Resilient
Space Efficient
Simple O&M

Sequencing Batch Reactor (SBR)

An automated single-tank system operating in timed cycles — fill, aerate, settle, and decant — delivering excellent nutrient removal without a separate secondary clarifier. SBR plants are highly automated, reducing operator skill requirements, and are well-suited to residential estates and commercial complexes where consistent high-quality effluent is required for reuse in irrigation. The automation also provides built-in compliance data logging.

Fully Automated Nutrient Removal High Effluent Quality No Separate Clarifier Irrigation Reuse Data Logging
Automated
Reuse-Ready

Constructed Wetlands and Nature-Based Systems

Engineered wetlands use plant–microorganism interactions in gravel or soil media to treat sewage naturally, producing very low-energy, low-cost treatment for eco-lodges, rural schools, mission hospitals, and small communities. They integrate beautifully into landscaped settings, require minimal technical operation, and produce treated water of quality suitable for crop irrigation and ecological reuse. Ideal for environmentally sensitive areas and sites with no reliable power supply.

Zero Energy Option Eco-Lodges Rural Schools Mission Hospitals Irrigation Reuse Lowest OPEX
Eco-Friendly
Lowest OPEX

Extended Aeration and Oxidation Ditch Systems

Extended aeration systems provide long hydraulic retention times for thorough biological treatment — producing a highly stabilised sludge that requires infrequent removal, reducing sludge handling costs. Oxidation ditch configurations are particularly well-suited to large residential estates, peri-urban communities, and municipal-scale projects. Their robustness to operational variation and low sludge production make them a preferred choice for facilities where technical staffing is a challenge.

Low Sludge Production Peri-Urban Communities Large Estates Municipal Scale Robust Operation
Low Sludge
Large Scale
Who Needs an STP

WHO IN KENYA IS REQUIRED TO INSTALL A SEWAGE TREATMENT PLANT

Any development that generates sewage and is not connected to a municipal sewer network — or whose effluent exceeds the sewer acceptance standards — is required by NEMA to install and operate an on-site sewage treatment plant.

🏘️

Residential Estates & Gated Communities

The single largest driver of STP demand in Kenya. Estates of 20 units and above outside the Nairobi, Mombasa, or Kisumu municipal sewer network require a licensed on-site STP to obtain occupation certificates.

🏨

Hotels, Lodges & Resorts

Particularly those in coastal, lake, and national park buffer zones where discharge standards are strictest. MBBR and constructed wetland systems are the preferred technology for space-constrained hospitality sites.

🏥

Hospitals & Medical Facilities

Healthcare wastewater contains pharmaceuticals, pathogens, and chemical contaminants. NEMA and public health regulations require healthcare facilities to treat sewage to higher standards than general domestic sewage before discharge.

🏫

Schools, Colleges & Universities

Boarding schools, universities, and large day schools outside municipal sewer areas must treat sewage on-site. We design robust, low-maintenance systems suited to management by non-specialist facilities staff.

🏢

Commercial & Office Complexes

Large commercial developments, business parks, and office complexes outside the sewer network require on-site sewage treatment. We design compact systems sized for peak occupancy loads with minimal footprint.

Religious & Social Institutions

Mission hospitals, religious campuses, community centres, and rural NGO facilities require cost-effective, low-maintenance sewage treatment. Constructed wetlands and package biodigesters are often the optimal solution.

🏭

Industrial Facilities & EPZs

Industrial facilities and Export Processing Zones generating domestic sewage from staff facilities — separate from process effluent — require compliant on-site sewage treatment systems for worker welfare and NEMA compliance.

Eco-Lodges & Camp Sites

Remote eco-tourism facilities in conservation areas and national park buffer zones require off-grid, ecological sewage treatment — typically constructed wetlands or biodigesters — that treat sewage without electricity and produce irrigation-quality water.

Warning Signs

SIGNS YOUR EXISTING SEWAGE SYSTEM IS FAILING

If any of these apply to your facility, you likely need a new STP or an urgent upgrade to your existing system.

⚠️

Persistent Sewage Odour On-Site

Foul odours from septic tanks, soakage pits, or treatment systems indicate overloading, poor biological activity, or hydraulic failure — all leading to NEMA non-compliance.

⚠️

Failed Quarterly NEMA Test

A failed BOD, COD, TSS, or coliform test is a compliance breach. Two consecutive failures typically trigger a NEMA stop-order notice. Immediate corrective action is required.

⚠️

NEMA Stop-Order or Notice

If you have received a NEMA notice, you are already in breach. Contact us immediately — a package STP can be operational in 6 to 8 weeks while a permanent solution is designed and procured.

⚠️

Septic Tank Overflowing or Saturated

A septic tank that requires emptying more than quarterly, or soakage pits that are waterlogged, indicate that the system is oversaturated and failing — a public health and regulatory risk.

⚠️

Development Application Rejected

If your development application or occupation certificate has been rejected for lack of a satisfactory sewage management plan, an STP feasibility study and EIA is the required first step.

⚠️

Borehole or Well Contamination

If your on-site borehole or neighbours’ wells show coliform contamination, inadequate sewage treatment is likely the source. A licensed STP and post-treatment disinfection is essential.

Regulatory Framework

NEMA SEWAGE TREATMENT COMPLIANCE REQUIREMENTS IN KENYA

Kenya’s legal framework for sewage treatment is clear. Non-compliance carries serious consequences including fines of up to KES 2 million, production/operation shutdowns, and criminal prosecution of directors. Here is exactly what is required.

🧪

Key Discharge Standards (Second Schedule — Inland Waters)

  • BOD₅ — not to exceed 30 mg/L
  • COD — not to exceed 50 mg/L
  • Total Suspended Solids (TSS) — not to exceed 30 mg/L
  • pH — must be maintained between 6.0 and 9.0
  • Oil and Grease — not to exceed 5 mg/L
  • Total Coliforms — not to exceed 1,000 MPN / 100 mL
  • Ammonia Nitrogen — not to exceed 5 mg/L
  • Colour, temperature, and odour limits also apply

A non-compliant sewage system can result in immediate stop-operation orders, fines of up to KES 2 million, and criminal prosecution under EMCA. Request a NEMA compliance assessment for your facility →

Cost Transparency

SEWAGE TREATMENT PLANT COST GUIDE FOR KENYA

Budgetary cost ranges for STP design, installation, and annual O&M in Kenya. All projects are priced individually after site survey and effluent assessment — these ranges guide budget planning only.

STP Type / Scale Daily Flow Population Equiv. Supply & Install (KES) Annual O&M (KES) Delivery Timeline
Package Biodigester – Small 1 – 10 m³/day 5 – 50 persons 150,000 – 600,000 180,000 – 360,000 2 – 4 weeks
Package STP – Medium 10 – 50 m³/day 50 – 250 persons 600,000 – 2,500,000 360,000 – 720,000 4 – 8 weeks
Package STP – Large 50 – 200 m³/day 250 – 1,000 persons 2,500,000 – 9,000,000 720,000 – 1,440,000 6 – 12 weeks
Civil MBBR / SBR 100 – 500 m³/day 500 – 2,500 persons 8,000,000 – 28,000,000 1,200,000 – 2,400,000 4 – 7 months
Civil ASP / Extended Aeration 500+ m³/day 2,500+ persons 25,000,000+ 2,400,000+ 6 – 14 months
Constructed Wetland 5 – 100 m³/day 25 – 500 persons 400,000 – 6,000,000 120,000 – 480,000 6 – 16 weeks

* All figures are budgetary estimates for planning purposes only. VAT and design fees additional. Request a site-specific quotation →

Our Approach

HOW MAJI HILL DELIVERS AN STP PROJECT IN KENYA

A disciplined six-phase project methodology — from initial site visit to a fully commissioned, NEMA-compliant sewage treatment plant with rigorous documentation at every stage.

1

Site Visit & Population Assessment

We visit your site, assess the number of users and peak load patterns, inspect existing sewage infrastructure, confirm the discharge point and constraints, and gather all data needed to design the right STP.
Free Initial Assessment
2

Feasibility Study & Technology Selection

Based on site data, discharge requirements, available land, budget, and operational capability, we prepare a written feasibility study comparing technology options and recommending the optimal STP configuration with capital and operating cost estimates.
Written Report Issued
3

Detailed Design & NEMA EIA Submission

Approved concepts are developed into full engineering drawings and EIA documentation. We manage the NEMA submission — attending hearings, responding to queries, and securing the EIA licence and discharge consent before any construction begins.
Licence Secured
4

Construction & Installation

Civil, mechanical, and electrical works by NCA-registered teams under a qualified site engineer. Quality assurance checks at every construction stage. Progress reports at agreed intervals. Package STP delivery and installation where appropriate.
QA Programme
5

Commissioning & Performance Testing

The STP is commissioned in phases — mechanical run-in, biological seeding, and full performance testing. Treated effluent is tested at a KEBS-accredited laboratory against the discharge consent parameters to confirm NEMA compliance before handover.
Accredited Lab Test
6

Handover, Training & O&M

Structured operator training delivered. As-built drawings, O&M manuals, and spare parts schedules handed over. Where an O&M contract is agreed, our trained operators take responsibility for the plant from day one of operation.
Trained Operators
📜
NEMA Licence Managed
Full EIA preparation and NEMA submission management included in every design project
🏅
12-Month DLP
12-month defects liability period on all STP construction and installation works
🧪
Performance Guarantee
STP commissioned against discharge consent — verified by KEBS-accredited laboratory
📋
Full Documentation
As-built drawings, O&M manuals, test certificates, and compliance records issued at handover
Technology Comparison

COMPARING STP TECHNOLOGIES FOR KENYAN CONDITIONS

An honest side-by-side comparison of the main sewage treatment technologies we install — so you understand the trade-offs before we present our recommendation for your development.

Factor Package Biodigester Activated Sludge (ASP) MBBR SBR Constructed Wetland
Land footprint Very compact Large Compact Compact Large
Capital cost (relative) Lowest Medium Medium Medium – High Low
Operating complexity Very Low Medium – High Low – Medium Medium (automated) Very Low
Effluent quality Good Excellent Excellent Excellent Good
Suitable for reuse With polishing Yes Yes Yes Yes (irrigation)
Max scale (m³/day) Up to 500 Unlimited Up to 2,000 Up to 5,000 Up to 200
Delivery speed to compliance 2 – 8 weeks 4 – 12 months 3 – 6 months 3 – 7 months 6 – 16 weeks
Power dependency Low High Medium Medium None
Self-Assessment

WHAT STP SOLUTION DOES YOUR FACILITY NEED?

Answer four quick questions and get an instant personalised recommendation for your sewage treatment situation in Kenya.

What is your primary sewage treatment need right now?

Pick the description that best matches your current situation.
New STP – Don’t Have One
Need to design and build a new plant
Existing System Failing
Septic tank overloaded or NEMA test failed
O&M Contract Needed
Have a plant but need expert maintenance
NEMA Notice Received
Under enforcement — urgent compliance needed
Step 1 of 4

What type of facility or development are you treating?

Facility type determines the design flow, load patterns, and technology suitability.
Residential Estate
Gated community or housing development
Hotel, Lodge, or Resort
Hospitality facility, eco-lodge, camp
School or Hospital
Educational campus or healthcare facility
Commercial / Industrial
Office complex, factory, institution
Step 2 of 4

How many people will the STP serve at peak capacity?

Population equivalent determines the required plant capacity and technology scale.
Under 100 Persons
Small facility or institution
100 – 500 Persons
Medium estate, hotel, or school
500 – 2,000 Persons
Large estate, hospital, or campus
Over 2,000 Persons
Major development or community
Step 3 of 4

How urgent is your sewage treatment requirement?

Urgency determines whether a package STP or conventional construction route is more appropriate.
Immediate – NEMA Enforcement
Notice received or inspection imminent
3 to 6 Months
Urgent but can plan conventionally
6 to 18 Months
New or expanding development planning
Ongoing O&M Only
Plant exists — need operational support
Step 4 of 4
RECOMMENDATION READY

Loading recommendation…

Request a Site Survey
Our Territory

STP PROJECT DELIVERY AREAS ACROSS KENYA

Maji Hill delivers sewage treatment plant projects across Kenya — from Nairobi satellite towns to coastal resorts, Rift Valley estates, and Central Kenya institutions. Type your location below to confirm coverage.

Nairobi
Kiambu
Ruiru
Thika
Limuru
Kikuyu
Athi River
Machakos
Kajiado
Ngong
Mombasa
Kilifi
Malindi
Diani
Lamu
Nakuru
Naivasha
Eldoret
Kisumu
Kericho
Nyeri
Nanyuki
Embu
Kitale
Muranga
Meru
Kisii
Narok
Client Reviews

WHAT KENYAN CLIENTS SAY ABOUT MAJI HILL STP SERVICES

Real feedback from estate managers, facility directors, and operations staff whose sewage treatment plants Maji Hill has designed, built, and maintains across Kenya.

★★★★★

“Our estate in Ruiru had its occupation certificate held up for 8 months because the county required a licensed sewage treatment plant. Maji Hill completed the site survey, EIA, and installation of a package STP in under 10 weeks. Certificates issued, estate occupied. Professional from start to finish.”

Developer, Ruiru Gated Estate
★★★★★

“We had an MBBR system installed for our 150-bed hospital in Nyeri three years ago. Maji Hill’s O&M team runs it daily — not a single failed NEMA quarterly test since commissioning. The plant is quiet, well-maintained, and fully documented. Excellent value for compliance peace of mind.”

Administrator, Nyeri Regional Hospital
★★★★★

“Our lodge on the Mara was warned by NEMA about our old septic system. Maji Hill designed a constructed wetland that blends into our landscape, runs without power, and produces treated water we use to irrigate our herb garden. The NEMA inspector returned and praised the installation. Exactly what we needed.”

Owner, Maasai Mara Safari Lodge

GET A NEMA-COMPLIANT SEWAGE TREATMENT PLANT FOR YOUR KENYAN DEVELOPMENT

Whether you need a new STP designed and installed, an existing system upgraded to meet NEMA standards, or an O&M team to keep you compliant year-round — Maji Hill delivers across the complete STP lifecycle. Protect your development approval. Protect Kenya’s water. Start with a free site assessment.

Get a Proposal

REQUEST AN STP SITE SURVEY OR PROPOSAL

Tell us about your development and sewage challenge. We will respond within 24 hours with a proposed scope, timeline, and next steps.

Got Questions?

SEWAGE TREATMENT PLANT KENYA – FREQUENTLY ASKED QUESTIONS

Honest answers to the questions Kenyan developers, estate managers, facility officers, and business owners ask before commissioning an STP project with Maji Hill.

A sewage treatment plant processes domestic and institutional wastewater — toilets, bathrooms, kitchens — removing solids, organic matter, nutrients, and pathogens before safe discharge or reuse. In Kenya, NEMA requires all developments outside the municipal sewer network — residential estates, hotels, hospitals, schools, commercial complexes, and rural institutions — to install and operate a licensed on-site STP. Operating without one is a criminal offence under EMCA 1999, attracting fines of up to KES 2 million and operation shutdowns.

Costs depend on technology, flow capacity, and site conditions. Package biodigester systems for small facilities (under 50 persons) start from around KES 150,000 to 600,000 supply and install. Package STPs for medium developments (50–500 persons) range from KES 600,000 to KES 9,000,000. Large civil STPs (MBBR, SBR, ASP) for developments of 500 to 2,500 persons range from KES 8,000,000 to KES 28,000,000. Annual O&M contracts range from KES 180,000 to KES 2,400,000 per year depending on plant size. Contact Maji Hill for a site-specific quotation after a free initial assessment.

A package STP for a small to medium development can be installed and commissioned in 2 to 8 weeks from order — the fastest route to NEMA compliance. Conventional civil STPs (MBBR, SBR, ASP) for larger developments take 3 to 12 months from design approval to commissioning. The EIA and NEMA licence process runs in parallel and typically takes 3 to 6 months. Maji Hill manages the entire process. If you are under NEMA enforcement pressure, we can often implement emergency operational improvements while a permanent package STP is procured and installed.

A septic tank provides only primary (physical) treatment — settling solids and allowing some anaerobic breakdown — before discharging partially treated effluent into a soakage pit or drain field. Septic tanks do not meet NEMA discharge standards for BOD, COD, or coliform removal and are not compliant for discharge to any water body or ground surface where groundwater may be affected. A sewage treatment plant provides full primary, secondary (biological), and often tertiary treatment, producing a treated effluent that meets NEMA standards for discharge or reuse. For any development of significant size, only an STP will achieve NEMA compliance.

Yes. We provide standalone O&M contracts for existing STPs across Kenya, regardless of the original designer or installer. We first carry out a plant condition assessment to identify any corrective works needed, then agree a performance baseline and take over daily operations, preventative maintenance, chemical dosing, sludge management, quarterly effluent testing, monthly reporting, and annual NEMA audit preparation. Most clients on Maji Hill O&M contracts achieve consistent NEMA compliance within two billing periods of handover. Contracts are available on monthly, quarterly, or annual terms.

Yes, and we actively design for reuse where it makes economic sense. Treated sewage effluent of appropriate quality can be reused for irrigation of non-food gardens and landscaping, toilet flushing (with a dedicated distribution system), sports field watering, dust suppression, and construction water. For residential estates, reuse of treated water for garden irrigation can reduce mains water consumption by 25–40%. Constructed wetland and SBR systems in particular produce effluent well-suited for irrigation reuse. We include reuse system design as part of STP projects where the client site layout and population support it.

Sludge (the solids removed during treatment) requires dewatering and legal disposal. Dewatered sludge from a properly operated STP is typically a stable, low-pathogen material suitable for landfill disposal or, in some cases, agricultural land application under NEMA guidance. Maji Hill’s O&M contracts include sludge dewatering management, scheduling of sludge removal from drying beds, and arrangement of legal disposal — keeping your site clean and NEMA compliant. Sludge removal frequency depends on plant size and loading, typically ranging from quarterly for small plants to monthly for large facilities.

Yes. In Kenya, construction of any sewage treatment plant requires an Environmental Impact Assessment (EIA) licence from NEMA before construction begins. This is mandatory under the Environmental (Impact Assessment and Audit) Regulations 2003. The EIA involves preparing a project report describing the STP design, discharge point, environmental management plan, and stakeholder consultation, then submitting to NEMA for review and approval. The EIA licence is typically issued within 3 to 6 months of submission if the application is complete. Maji Hill prepares and manages the entire EIA and NEMA submission process as part of the design phase.